Winter service equipment. Brine production systems. Requirements and test methods

Winter service equipment. Brine production systems. Requirements and test methods

Regular price
£166.00
Sale price
£166.00
Regular price
£83.00
Sold out
Unit price
per 

1   Scope

This document specifies the essential requirements of stationary systems for production of brines for winter road maintenance and includes tests of these requirements. Installation boundary: chloride and water inlet to the saturator, brine outlet to the spreading machine. Within the scope are materials, brine storage and brine loading/unloading equipment also. Mobile systems for production of brinesin situ are not content of this document.
The following points are not covered by this document:
  • System and construction requirements;
  • Requirements according to national and European legislations.