1 Scope
The scope of this ECSS Standard is limited to describing the key elements of project
planning and implementation and identifying the top level requirements and products
that together provide a coherent and integrated project planning across the 3 ECSS
branches.
Where other ECSS management, engineering, or product assurance standards contain more
specific and detailed requirements related to project planning, references are provided
to identify where these can be found within the ECSS system.
This standard may be tailored for the specific characteristic and constrains of a
space project in conformance with ECSS-S-ST-00.