Railway applications. Procedure to determine the performance requirements for radio systems applied to radio-based train control systems

Railway applications. Procedure to determine the performance requirements for radio systems applied to radio-based train control systems

Regular price
£322.00
Sale price
£322.00
Regular price
£161.00
Sold out
Unit price
per 

What is PD IEC/TS 62773 - Procedure to determine the performance requirements for radio systems about?  

PD IEC/TS 62773 is a technical specification that discusses radio systems applied to radio-based train control systems for railways. PD IEC/TS 62773 outlines a procedure to be used by rail transport authorities and radio suppliers to determine the appropriate performance requirements of radio system for a radio-based train control system, consistent with their specific business needs and existing conditions for a radio system for a radio-based train control system.  

PD IEC/TS 62773 itself consists in defining a procedure linking preconditions to some radio parameters. Then, the appropriate performance requirements are deduced by the user of the Technical Specification from the radio parameters. 

Who is PD IEC/TS 62773 -Procedure to determine the performance requirements for radio systems for? 

PD IEC/TS 62773 on the procedure to determine the performance requirements for radio systems is useful for: 

  • Personnel or staff for radio-based train control systems 
  • Test centres 
  • Regulatory authorities 

Why should you use PD IEC/TS 62773 - Procedure to determine the performance requirements for radio systems? 

Radio-based train control systems are a traditional signalling system where the train location is detected by the track circuit, and the train is controlled by wayside signalling equipment. Therefore, an enormous volume of ground equipment is required for track circuits, level crossing, and so on. 

PD IEC/TS 62773 guideline assists you with an outline of the process for determining performance requirements, the definition of preconditions on the available spectrum, the definition of preconditions on railway operation, radio parameters, railway line conditions, operational conditions, TC communication requirement, the relationship between preconditions, and radio parameters for radio systems applied to radio-based train control systems. 

With obedience and compliance to PD IEC/TS 62773, you can meet acceptable performance for radio systems that are applied to radio-based train control systems to enable data exchange with quality of service for the railway systems.