1 Scope
The purpose of this document is to establish, in a general way, suitable procedures
and tolerances for the installation of bulb turbine and generator. This document presents
a typical assembly and whenever the words “turbine” and “generator” are used in this
part, it refers to bulb turbine and generator. There are many possible ways to assemble
a unit. The size of the machine, the design of the machine, the layout of the powerhouse,
the sequence of concreting or the delivery schedule of the components are some of
the elements that could result in additional steps, or the elimination of some steps
and/or assembly sequences.
It is understood that a publication of this type will be binding only if, and to the
extent that, both contracting parties have agreed upon it.
The document excludes matters of purely commercial interest, except those inextricably
bound up with the conduct of installation. It also excludes specifications of the
civil works but this aspect of the work should be taken into consideration during
the assembly of the units.
Wherever the document specifies that documents, drawings or information are supplied
by a manufacturer (or by manufacturers), each individual manufacturer will furnish
the appropriate information for their own supply only.